11133899cd.wordpress.com
11133899cd | Motorbike project UL 2013-2014Motorbike project UL 2013-2014
http://11133899cd.wordpress.com/
Motorbike project UL 2013-2014
http://11133899cd.wordpress.com/
TODAY'S RATING
>1,000,000
Date Range
HIGHEST TRAFFIC ON
Sunday
LOAD TIME
1.6 seconds
16x16
32x32
PAGES IN
THIS WEBSITE
13
SSL
EXTERNAL LINKS
36
SITE IP
192.0.78.13
LOAD TIME
1.563 sec
SCORE
6.2
11133899cd | Motorbike project UL 2013-2014 | 11133899cd.wordpress.com Reviews
https://11133899cd.wordpress.com
Motorbike project UL 2013-2014
Rear Fender | 11133899cd
https://11133899cd.wordpress.com/2013/12/06/rear-fender
Motorbike project UL 2013-2014. On December 6, 2013. The rear fender is of elliptical shape and is going to represent the Ford Logo. at the time of this picture the fender had recieved its first coat of blue paint and was awaiting a second and then the stencil would be applied to put the Ford Logo onto it. Larr; Completed Frame. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). Notify me of new comments via email.
Completed Frame | 11133899cd
https://11133899cd.wordpress.com/2013/12/06/completed-frame
Motorbike project UL 2013-2014. On December 6, 2013. The title says it all really. A picture of the completed frame excluding any peripherals that are yet to be added to the bike. Larr; Tank Mount. One comment on “ Completed Frame. December 6, 2013 at 3:16 am. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). You are commenting using your WordPress.com account. ( Log Out. Notify me of new comments via email.
11133899cd | 11133899cd
https://11133899cd.wordpress.com/author/11133899cd
Motorbike project UL 2013-2014. All posts by 11133899cd. On December 6, 2013. The rear fender is of elliptical shape and is going to represent the Ford Logo. at the time of this picture the fender had recieved its first coat of blue paint and was awaiting a second and then the stencil would be applied to put the Ford Logo onto it. On December 6, 2013. The title says it all really. A picture of the completed frame excluding any peripherals that are yet to be added to the bike. On December 6, 2013. Here is...
Basic Frame Completion | 11133899cd
https://11133899cd.wordpress.com/2013/12/06/basic-frame-completion
Motorbike project UL 2013-2014. On December 6, 2013. Here is the basic frame of the bike. I feel it came together quite nicely. encountered some difficulty joining some of the bars due to 3 bars meeting at a point. It became quite awkward to work out angles and planes of intersection to ty and make the bars sit as smoothly as possible for a clean weld. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). Front of the Bike.
Mounting front suspension | 11133899cd
https://11133899cd.wordpress.com/2013/12/06/mounting-front-suspension
Motorbike project UL 2013-2014. On December 6, 2013. I TIG welded a bar on the front of my frame so as to mount the front of my bike. The picture on the right is of the TIG weld itself and the left is showing the Mount. Larr; Basic Frame Completion. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). You are commenting using your WordPress.com account. ( Log Out. You are commenting using your Google account. ( Log Out.
TOTAL PAGES IN THIS WEBSITE
13
About | 11153148mk
https://11153148mk.wordpress.com/about
This is an example of a page. Unlike posts, which are displayed on your blog’s front page in the order they’re published, pages are better suited for more timeless content that you want to be easily accessible, like your About or Contact information. Click the Edit link to make changes to this page or add another page. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). Notify me of new comments via email.
Prototype and Working drawings. | 11151137moc
https://11151137moc.wordpress.com/2013/09/25/56
Prototype and Working drawings. September 25, 2013. I gathered my parts for the bike off of an old mini motor bike. I decided to use the engine, wheels and brake. From the beginning I’ve wanted my bike to be functional so this stage required alot of thought. My main challenges included:. How to mount the engine to frame. Figuring out the distance of the rear wheel from the engine as the chain must have the right amount of tension. Hooking up the brakes and throttle. Width of the front suspension. You are...
Artificial Fuel Tank Realised. | 11151137moc
https://11151137moc.wordpress.com/2013/11/07/fuel-tank-realised
Artificial Fuel Tank Realised. November 7, 2013. I began work on my fuel tank today. I was surprised by how quickly you can shape the tan cast along with the smooth finish. I will consider this in future projects. Staying with my agriculture theme I shaped the tank in the form of a seed. It could also be taken as a grain or a cavern tomato or even a ridged gourd, It’s up to the observers discretion. November 7, 2013. Frame Building. →. One thought on “ Artificial Fuel Tank Realised. You are commenting us...
November | 2013 | 11151137moc
https://11151137moc.wordpress.com/2013/11
Monthly Archives: November 2013. Exhaust construction and Engine paint. This was a complex job and required alot of think and rethinking. My design changed numerous times as I undertook this task due to the limited time I had to use. The exhaust is made solely from stainless steel and the bends are pre curved pieces. I bought the bends for three euro each as…. November 28, 2013. November 28, 2013. November 7, 2013. Artificial Fuel Tank Realised. I began work on my fuel tank today. I was surprised by ...
Functional Fuel Tank. | 11151137moc
https://11151137moc.wordpress.com/2013/11/28/functional-fuel-tank
November 28, 2013. For this piece I simply got 50mm aluminium tubing and faced it off on the lathe. I followed this up by acquiring a brass bar the same diameter. Either end was machined down to the internal size of the aluminium tube. The Brass was hammered into the tube with a wooden mallet. In essence-an interference fit. I carried out a leak test by filling the tube with water which it passed with flying colours surprisingly. November 28, 2013. Artificial Fuel Tank Realised. Refining of the frame.
Exhaust construction and Engine paint. | 11151137moc
https://11151137moc.wordpress.com/2013/11/28/exhaust-construction-and-engine-paint
Exhaust construction and Engine paint. November 28, 2013. This was a complex job and required alot of think and rethinking. My design changed numerous times as I undertook this task due to the limited time I had to use. I started by measuring everything three times just to be sure! Any angles cut were done using the power hack saw set at 45 degrees. This allowed for 90 degree angles. November 28, 2013. Refining of the frame. Frame and Theme Decisions. Bike Completion. →. December 5, 2013 at 10:25 pm.
The Beginning. | 11151137moc
https://11151137moc.wordpress.com/2013/09/19/the-beginning
September 19, 2013. When I think of a motorbike the images that instantly form in my mind are ones of low sleek machines passing in a blur with a vibrant assortment of colours. I feel the absurd speeds and the spine tingling shriek of naturally aspirated engines. Needless to say, I was excited to discover we were making a motorbike this semester. 8221; and ” What’s this rake angle I’ve been seeing everywhere and how does it affect the bike? Primary among these is the rake angle. This angle is formed betw...
Frame Building. | 11151137moc
https://11151137moc.wordpress.com/2013/11/07/frame-building
November 7, 2013. At this point I have approximately 90% of the frame complete. This was the most difficult part of the project by far. Trying the line up the tubing, tack welding it on and stepping back to see if it was aligned with the rest of the bike only the see it being crooked happened way too often…. I used a combination of TIG,MMA and MIG with TIG being the most used. I didn’t take many photos of the processes due to being engrossed in the whole thing. Frame parts tacked on. Front piece tacked on.
October | 2013 | 11151137moc
https://11151137moc.wordpress.com/2013/10
Monthly Archives: October 2013. Up until now I have been solely focused on the bike frame side of things. I haven’t really thought about the fenders, mud guards and the fuel tank. I decided to begin with the fuel tank. Now that I know it’s to be made out of foam I have a good idea of what’s possible.…. October 9, 2013. Moving on from the frame I needed to decide how I would incorporate my rear suspension in my design. In other words, how would I implement it? October 3, 2013. Artificial Fuel Tank Realised.
Fuel Tank Ideas. | 11151137moc
https://11151137moc.wordpress.com/2013/10/09/fuel-tank-ideas
October 9, 2013. Up until now I have been solely focused on the bike frame side of things. I haven’t really thought about the fenders, mud guards and the fuel tank. I decided to begin with the fuel tank. Now that I know it’s to be made out of foam I have a good idea of what’s possible. The message which I took from the lecture on the tank design was to keep it as simple as possible with sweeping curves rather that sharp edges. I narrowed it down to two designs eventually. October 9, 2013. Notify me of ne...
TOTAL LINKS TO THIS WEBSITE
36
閲金沙娱乐场,www.111333js.com,利记网络21点,无限21点真人赌博,巴宝莉线上娱乐城
欧洲杯2014而后满意这个需要 plain and s. 红九娱乐城周星驰衣着 复旧西装 br 在北. Http:/ www.111333js.info 溯源閲金沙娱乐场海丝路,巴宝莉线上娱乐城,共利记网络21点寻平安www.yh5588.com.无限21点真人赌博茶 茶www.203sb.com閲金沙娱乐场,www.111333js.com,利记网络21点,无限21点真人赌博,巴宝莉线上娱乐城.
bzsghu817.pw
2D热血PK品牌新作《魔魂传说》官方网站
您访问的页面不存在
您的域名已过期|易名中国:域名交易,域名注册,域名查询,域名应用:eName.Net
电话 400-0044-400 传真 400-0044-400-5 客服 1001@ename.com 财务 cw@ename.com 投诉 kfts@ename.com.
11133899cd | Motorbike project UL 2013-2014
Motorbike project UL 2013-2014. On December 6, 2013. The rear fender is of elliptical shape and is going to represent the Ford Logo. at the time of this picture the fender had recieved its first coat of blue paint and was awaiting a second and then the stencil would be applied to put the Ford Logo onto it. On December 6, 2013. The title says it all really. A picture of the completed frame excluding any peripherals that are yet to be added to the bike. On December 6, 2013. Front of the Bike. Here is the b...
111339.com
您访问的域名正在出售 The domain is for sale! 邮箱: topname@aliyun.com 手机: 18206065858 QQ: 3185611.
游戏下载大全中文版下载电脑 -hycz01官网
狠狠撸最新地址
This domain is expired. If you're the owner, you can renew. It If you're not the owner, search for your next domain. And then build your website. For free on Dynadot.com.
111340.com